skip to main
|
skip to sidebar
Absolute Finishing Home & Basement 2007
Steven C. Nelson, Contractor (651) 308-5905
Sunday, September 30, 2007
Hickory Wood Floors
A whole first level with new pre-finished Hickory wood floors.
New Stairs
Stairs after. The stairs were turned 90 degrees by opening up the enclosed wall and making them wider at the bottom. New carpet was added and a rail with wood trim along the outside of the risers.
Before the rail was added.
Monday, September 10, 2007
Master Bathroom, Wall & Shower Tile
Shower nook for shampoo, soap etc.... (no grout)
Master bathroom shower.
Tub with new tile on the wall and around the tub.
Sunday, September 9, 2007
Stair Remodel
The wall on either side of the stairs were opened up and new rail and bottom step were added along with wood trim on either side.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
My 2008 Photos Link
Absolute Finishing Home & Basement 2008
Finish Basement with custom bar
15 years ago
Contractor
License # BC-20328568
For a free Estimate
Call Steve (651) 308-5905
***Ask me about my Tile Special!!***
Blog Archive
►
2008
(5)
►
August
(1)
►
January
(4)
▼
2007
(26)
►
November
(1)
▼
September
(4)
Hickory Wood Floors
New Stairs
Master Bathroom, Wall & Shower Tile
Stair Remodel
►
June
(1)
►
May
(20)
About Me
Nelson's
Steven, Lorraine, Kendra, Celina and Logan
View my complete profile